top of page

RECENT PROJECTS

The Nelson’s Project

"FLORENCE" PB-50

Palm Beach 50-03 "Florence" Re-fit. The Rowell Marine Shipwrights team carried out a full transformation of this classic Palm Beach 50. Changing the interior layout moving the lower galley up into the saloon to allow for a new enclosed second cabin. In the cockpit the team changed the layout to create a more social, practical entertaining space. Completely changing the cockpit layout by moving the seating area to the aft end of the cockpit and adding a bar area with all the latest appliances to the new bar area. The team also extended the swim platform while she was out of water.

The Nelson’s Project

"CIGARETTE"

Formula 233 "Cigarette" Rowell Marine Shipwrights were approached to carry out the final fit out stages of this very special project. This included installing all custom fittings, building and fitting custom teak trims & doors, Installation of the faux teak decking & all additional decals & trims. We were honnered to be a part of this project.

20131 Grove Street

"SIROCCO" PB-55

The Rowell Marine Shipwrights team has revitalized the Palm Beach 55 Sirrocco, undertaking a comprehensive restoration that included respraying the motor yacht from the mast down to the waterline with the premium Awlgrip paint system, restoring it to a factory-fresh finish. The project also featured the installation of exquisite new teak decking and the application of fresh exterior varnish, enhancing the vessel's elegance and beauty. Throughout the process, additional specialized expertise was seamlessly integrated to ensure the highest quality results.

The Jefferson’s Lake House

"LA CAROLINA BELLINI" PB-50's

Both Bellini & La Carolina are two classic PB-50's. The team removed and replaced the teak decking on the foredeck & swim platform on both boats. All components being pre fabricated off site and installed. 

The Jefferson’s Lake House

"S/Y ALLEGRO"

A look back at this project completed by the very skilled RMS team back in late 2021.
All teak decking was prefabricated in our workshops in Sydney and shipped to Melbourne then installed.
This was a challenging project during covid times but the team pushed through all adversity and achieved a great result.